Exterior Paint Approval Request

Architectural Control Committee — required before painting begins.

Per the Declaration of Restrictions (Section 6.04), all exterior paint colors must be approved by the Architectural Control Committee before painting begins. Earth tones are preferred. Submit this form along with physical color swatches or photos of swatches.

Please allow up to 5 business days for review.

Prefer to print and email? Download the PDF version and email to chair@theboardkc.org.

Homeowner Information

Your address within The Oaks subdivision

Paint Colors

Furnish a physical color swatch sample for each color below, OR upload clear photos of swatches. Earth tones are preferred.

e.g., 'Sherwin-Williams Harvest Brown SW 7702'

Only if different from siding/trim

JPG, PNG, or HEIC. Max 10MB each, up to 5 files.

Work Details

Who is doing the work?

Neighbor Notification

Both adjacent neighbors must be informed before submission. The Committee will follow up with them if needed.

Acknowledgment

Type your full name — this acts as your signature.