Solar Panel Approval Request

Home Improvement Committee — required before solar installation.

Solar panels must be flat to the roof. Panels are allowed on the front of the house only if efficiency would be too low with rear-only placement. Provide a roof diagram showing panel layout, color, and type, plus all engineering and installation documentation.

Please allow up to 5 business days for review.

Prefer to print and email? Download the PDF version and email to chair@theboardkc.org.

Homeowner Information

Installer

Who is doing the work?

System Details

Panel placement

Include site plan and equipment specs. JPG, PNG, HEIC, or PDF. Max 10MB each, up to 8 files.

Neighbor Notification

Both adjacent neighbors must be informed before submission.

Acknowledgment

Type your full name — this acts as your signature.

Required field